Fig. 01 — Development sequence

SITEPowerFirst gateFibreResilience + connectivityLandControl + suitabilityWater / coolingDesign basisApprovalsPath to consentCommunityLicence to proceedDeliveryCost + programme
  1. PowerFirst gate
  2. FibreResilience + connectivity
  3. LandControl + suitability
  4. Water / coolingDesign basis
  5. ApprovalsPath to consent
  6. CommunityLicence to proceed
  7. DeliveryCost + programme
  8. SiteWhere the gates line up

Power is the first gate.

From opportunity
to investment decision.

The Australian development platform for global data centre projects.

Find out more

Data centres are energy infrastructure.
Not real estate.

The site starts with power.

Then fibre, land, cooling, approvals, community and delivery have to line up.

Bondaian develops those interfaces together.

The development test

  1. PowerFirst gate
  2. FibreResilience + connectivity
  3. LandControl + suitability
  4. Water / coolingDesign basis
  5. ApprovalsPath to consent
  6. CommunityLicence to proceed
  7. DeliveryCost + programme
  8. FIDCapital decision

From site to FID

From site to FID.

Turn an opportunity into a project the owner can invest in.

  1. 01

    Originate

    Bondaian

    Identify the corridor. Test power, fibre and utilities. See whether a site can be controlled, and whether it is worth taking further.

  2. 02

    Develop

    Bondaian

    Run grid connection, planning and approvals, design, government, community, cost and programme as one development.

  3. 03

    Ready for FID

    Bondaian

    Scope defined. Approvals in hand or far enough along. Utility path understood. Cost and programme developed. Risks retired, allocated or priced.

  4. 04

    EPC / construction

    After FID

    The owner decides whether to commit capital. Construction delivery takes over.

Bondaian carries the development to FID. The capital decision is the owner’s.

Australia

Australia is not one data centre market.

Follow the power. Then test the site.

Screen corridors first.
Parcels second.

9 corridors are on the public map. Mature, regional, and exploratory. No parcels are published.

Development now extends beyond the site.

Power, water, infrastructure cost, community impact and energy supply have become national policy issues.

Successful development increasingly requires political, regulatory and community strategy alongside engineering and approvals.

One Australian development platform.

International developers should not need to assemble a new Australian development organisation for every project.

Bondaian provides the local development layer.

  • Land
  • Energy
  • Engineering
  • Planning
  • Government
  • Community
  • Commercial
  • Delivery

Bondaian stays on the owner’s side of the table.

Find out more.